Start practice — 8 questions →
Sample questions
When treating foundations deeper than 4 feet outdoors, what is the required application rate?
- 1.0 to 1.5 gallons per 10 square feet
- 2 gallons per 10 linear feet per foot of depth
- 0.06% finished dilution per 10 linear feet
- 4 gallons per 100 gallons of water
Show answer
For foundations deeper than 4 feet, the rate is 2 gallons per 10 linear feet per foot of depth.🔗 Source
If the soil will not accept the labeled volumes, what alternative application method is permitted?
- Apply at a 0.06% concentration using double the volume.
- Apply at a 0.25% concentration using half the volume of finished dilution.
- Apply at a 0.125% concentration using triple the volume.
- Apply only to the surface without trenching.
Show answer
The notes state that if soil will not accept labeled volumes, twice the concentration (0.25%) may be applied in half the volume of finished dilution.🔗 Source
To achieve a 0.125% finished strength, how much Termidor 80 WG should be mixed with 67 gallons of water?
- 2 units
- 4 units
- 6 units
- 8 units
Show answer
The mixing instructions state that 4 units of product in 67 gallons of water results in a 0.125% finished strength.🔗 Source
According to the label restrictions, what is the minimum finished dilution concentration allowed for horizontal and vertical treatments?
Show answer
The restrictions state DO NOT apply at a LOWER dosage and/or concentration than 0.06%, 0.09%, or 0.125%.🔗 Source
Which of the following pests is NOT listed as a target pest for Termidor 80 WG?
- Carpenter ants
- Drywood termites
- Bed bugs
- Borers
Show answer
The label lists subterranean, arboreal, drywood, and dampwood termites, carpenter ants, beetles, and borers, but does not mention bed bugs.🔗 Source
When applying Termidor 80 WG to horizontal treated zones beneath a concrete slab on ground, what nozzle pressure should be used?
- Exactly 25 PSI
- No more than 10 PSI
- 25 PSI or less
- At least 50 PSI
Show answer
The label specifies using a coarse application nozzle with a nozzle pressure of 25 PSI or less for horizontal treated zones.🔗 Source
Where can Termidor 80 WG be applied according to the 'location' descriptions for concrete slab horizontal treated zones?
- Outdoor only
- Indoor only
- Both indoor and outdoor
- Only in basements
Show answer
The label lists the location for Concrete Slab on Ground or in Basements - Horizontal Treated Zones as 'Both'.🔗 Source
What is a specific restriction regarding the treatment of footings?
- Do not treat the soil above the footing.
- Do not treat a structure below the bottom of the footing.
- Do not treat footings deeper than 4 feet.
- Do not treat footings with a concentration higher than 0.125%.
Show answer
The label explicitly states: 'DO NOT treat a structure below the bottom of the footing.'🔗 Source