When using Advance Termite Bait Cartridge II as a stand-alone preventative treatment for new construction in Florida, where should the stations be placed?

Show answer The label specifies placing stations around the outside of the structure only after the final exterior grade is established.

🔗 Source

Which target pest is this product designed to control?

Show answer The label facts state the target pest for this product is the termite.

🔗 Source

Which of the following is considered a 'non-structure area' for spot treatment according to the label?

Show answer The label lists railroad track beds as a non-structure area for spot treatment.

🔗 Source

Based on the provided label facts, what is the required rate for a preventative treatment for new construction in Florida?

Show answer The label specifies a rate of two 124 gram cartridges for new construction (Florida) preventative treatment.

🔗 Source

In what setting is this product intended to be used?

Show answer All application sites listed in the label facts (new construction, existing structures, and non-structure areas) are categorized as Outdoor.

🔗 Source

According to the label, what is the required number of 124 gram cartridges that must be in every bait station during an annual inspection?

Show answer The label states that for the annual inspection interval, every bait station must contain two 124 gram cartridges.

🔗 Source

Under what weather condition can inspections take place more than 30 days beyond the required interval?

Show answer The label states inspections cannot exceed the interval by more than 30 days unless cold temperatures persist below an average daily mean of 50°F.

🔗 Source

For pre-baiting existing structures, how often should the stations be inspected?

Show answer The label notes that for pre-baiting existing structures, you must inspect stations every 120 days.

🔗 Source